development_residual
development property value as completed value less costs and profit
incomeclosed_formIVS 410IFRS 13implemented
Formula reference: IVS 410.100.03 residual method
Inputs
| Name | Type | Req | Description |
|---|---|---|---|
| gross_development_value | number | ✓ | Anticipated value of the completed development (IVS 410 residual method). |
| development_costs | number | ✓ | All known/anticipated costs to complete the development. |
| developer_profit | number | ✓ | Required developer's profit/risk allowance (IVS 410). |
Standards
Risks & limits
- Deterministic model: the result is a point value with no modelled distribution; input error and model error are not quantified here.
- IVS/IFRS divergence on 'developer_profit': the two regimes treat this differently (IVS 410.100.03 residual deducts anticipated developer profit and risk vs IFRS 13 measures the completed asset at fair value (profit is in the exit price)); the choice is the caller's, not a default.
- Standards alignment is declared per method; see the cited clauses.
Call it
Try in playground →REST
curl -s -X POST https://fair-value.ascent-partners.com/v1/calculate/calculate_residual \
-H 'content-type: application/json' \
-d '{"method":"development_residual"}'MCP
// MCP tools/call
{ "name": "calculate_residual",
"arguments": { "method": "development_residual" } }